Home / news

Detailed explanation of the installation method of metal spr

2021-07-27

The installation method of metal spring curtain is explained in detail.

Detailed explanation of the installation method of metal spr

   1. Transport the metal spring net curtains and accessories to each construction site with vertical transportation equipment such as elevators.

 

   2. Use detergent to clean the inner side of the metal spring net curtain and the surface of the column frame.

 

   3. Connect the metal spring net curtain to the keel through the surrounding aluminum corners (hanging ears), and fix it on the keel.

 

   4. Fixing method. If it is seamless splicing inside, you can use an electric drill to rotate the hole on the keel, and then use flat head (counter-head) aluminum rivets; if it is a plate with glue seams on the outside, you can use steel screw (also (Called flange screws or phoenix tail nails) are directly drilled into the keel through the connecting holes of the aluminum angle code to fix the aluminum plate, but pay attention to controlling the tightness of the drill bit and adjusting the aluminum plate.

Detailed explanation of the installation method of metal spr

   5. The metal spring net curtain enters the site for trial assembly. First fix the aluminum plate slightly on the keel, pay attention to the installation accuracy control, and adjust the plate before tightening.

 

   6. When installing metal spring mesh curtains, install them on the wall in sequence according to the numbers of the metal spring mesh curtains.

 

   7. The installation of metal spring mesh curtains start from the front, large area, and corners, and the principle of installation from top to bottom.

 

   8. The connection between the aluminum plate and the keel must meet the requirements of the drawings, and must be firm and reliable, and bolts must be installed.

 

   9. The corners of the curtain wall and the surrounding walls, the connection structure of the upper and lower seals, and the treatment of deformation joints should meet the design requirements.

 

   10. Node structure and closing treatment

Detailed explanation of the installation method of metal spr

   ①Wall panel joints: Usually the joints of the joints are prone to uneven top and bottom or unequal panel surfaces, so one side panel should be installed first, and the line should be positioned, and the horizontal and vertical control lines should be used to determine the installation position of the other side panel. , After both sides of the board meet the requirements, draw rivets in turn and install the pressure board to fix it;

 

   ②The lower end of the wall is closed, and a special water baffle is made according to the actual size, the lower end is sealed, and the gap between the board and the wall is covered at the same time to prevent rainwater from infiltrating into the room;

 

   11. When installing, pay attention to the gap between the metal spring mesh curtain and the height requirements of the metal spring mesh curtain interface

 

   12. After the metal spring mesh curtain is installed, cover and protect the parts that are easy to be contaminated with plastic film or other materials.

 

   The above is the complete installation process of the metal spring mesh curtain. If you want to know more details, you can consult the customer service of this site.

pre:What requirements should be paid attention to when installin

next:The traditional method of distinguishing the pros and cons o